Chilled and Frozen Distribution Hub

As the first of its kind in the UK for a leading on-line retailer, Space Engineering were tasked with designing and installing the refrigeration equipment for a new £Multimillion, chilled and frozen facility.  As a turn-key project, we were assigned with the provision of the cold store construction, plant, controls, commissioning, and a supporting planned maintenance contract.

         

With a view on energy efficiency and future proofing of the refrigeration equipment, the best choice was a natural refrigerant – CO₂.

       

Working with the client on the expected room usage, we were able to calculate the heat loads.  This was then designed to a +35°c outside ambient, with 70% resilience between 2no refrigeration systems.  Each system has multiple compressors to share the running loads.  The Chilled design set point was at +1°c and the freezer design set point at -23°c.

        

To ensure energy efficiency we included parallel compressors, lead compressor inverters, EC fans, stepper expansion valves.

     

There was a restriction to the plant area footprint, so it was important to ensure the external equipment design was suitable.  For this reason, a V-block gas cooler was selected.

Environmental aspects had to be considered and overcome.  Noise levels were met, inverters were used for capacity control, future heat reclaim potential was included with a matrix of potential heat output to consider.

       

Some of the notable design elements of the project were:

  • Evaporator structural support design, split in pack/evaporator allocation to ensure full room operation in the event of a single plant failure
  • Fire strategy review with door positions worked through and established
  • Vertical evaporator pipework tails to limit condensation, EC fans, Freezer evaporator air socks and rear damper for the best possible defrost
  • Strategy of positioning Leak detection beacons/sounders and sensor locations to ensure persons and equipment were best protected
  • Shared containment co-ordination of refrigeration services with other discipline
  • Evaporator valve board drip trays included with connections to drain headers
  • Clear access locations and route highlighted above cold rooms for service and maintenance
  • Internal support with commissioning team providing a ‘commissioning intent’ document covering set points and operation of all equipment

         

Working to a short time scale and delivering the project during the COVID pandemic, Space delivered on time and on budget.

 

Related projects.

Picking Freezer Refrigeration

Picking Freezer Refrigeration

Our valued customer needed to replace their high GWP refrigeration equipment for their picking freezer.  As Space Engineering understand our clients needs, factoring both CAPEX...

Read more
AHU & Chiller Installation

AHU & Chiller Installation

One of Europe's leading meat processors approached Space Engineering, to provide a ventilation solution, for one of their meat processing facilities in England. We were...

Read more
Air Source Heat Pumps

Air Source Heat Pumps

Our valued client approached us with the objective to decarbonise the heating systems by introducing energy efficiency improvements within their customers facility.  These energy and...

Read more

Contact Us

We’d love to hear from you. Please enter your details in the form below and we will get back to you.

    I would like to opt in to marketing communications

    We take your privacy seriously. We will keep your data safe and we won’t pass it on to any third parties.
    Please see our privacy policy for more details.